Outdoor Recall Long Lead 5m

$30.00

Our 5 metre long with snap hook and EVA grip handle is an ideal tool for training dogs and puppies for recall training, or allowing dogs to roam in the park, or the beach, while still maintaining lead control.

An excellent light weight long lead that enables the dog to learn recall without the weight of a heavy lead (1.2cm wide rope).

WeightN/A
DimensionsN/A
Colour

Black, Green, Orange, Purple, Red

Shopping Cart